Crude Oil Gathering Pipeline System

November 5, 2017

Rapid and extensive development in North Dakota’s Bakken Formation has presented a number of opportunities and challenges. One such challenge is to comply safely and efficiently with increasing regulations on truck transport of crude oil. Our client seeks to develop a gathering system around Watford City, N.D., with a connection to the Tesoro crude oil pipeline.


Berthold Rail Loading Facility

October 15, 2017

The Bakken formation constitutes one of the world’s most rapidly developing shale plays. MKEC was contracted to plan, design and engineer a unit train loading facility to allow our client to move crude oil to market. The finished facility needed to be capable of handling eight unit trains per week while accommodating the switching requirements for an adjacent grain elevator.


U.S. 77 Over Black Bear Creek

September 4, 2017

We were asked to design a three-span bridge to replace an existing outmoded 1931 single-span steel trestle bridge over a tributary to the Arkansas River in north-central Oklahoma. This included relocating a driveway at one end of the bridge.


Stormwater Drainage – Fox Ridge

August 17, 2017

We were asked to create an upscale development with dominant water features and view-out basements resulting in desirable lots that would sell in a down economy. All of this needed to be accomplished within a budget that would make economic sense for the developer.


Kansas Star Casino Storm Water Control

June 20, 2017

The Kansas Star Casino development covers 206 acres including a 162,500-square-foot casino with hotel, parking lots and equestrian facilities. Site drainage design was a challenge as a result of multiple adjacent watersheds, downstream flow restrictions and shallow groundwater that had a history of causing problems within an adjacent residential development.


Recent Posts

Celebrating 40 Years of Engineering Success: Shocker Hall & Dining Facility - Wichita State University, Wichita, KSA multi-functional hub for students on the Wichita State University campus, we provided design and construction services for this complex, housing 780 students in a 330,000 SF dormitory with a large kitchen and 400-seat dining hall. With a tight 17-month design and construction timetable, this $60M project was substantially completed in August 2014 – in time for students to move in for the fall semester. #EngineeringSuccess #40years ... See MoreSee Less
View on Facebook
Check out this cool video of the new bridge at Swanson Park our team designed. This is a great improvement for a busy park that so many people enjoy. ... See MoreSee Less
View on Facebook

Media Contact

Cindy Womack
316.684.9600

Email Us

Signup for eNews