News

Berthold Rail Loading Facility

October 15, 2017

The Bakken formation constitutes one of the world’s most rapidly developing shale plays. MKEC was contracted to plan, design and engineer a unit train loading facility to allow our client to move crude oil to market. The finished facility needed to be capable of handling eight unit trains per week while accommodating the switching requirements for an adjacent grain elevator.


U.S. 77 Over Black Bear Creek

September 4, 2017

We were asked to design a three-span bridge to replace an existing outmoded 1931 single-span steel trestle bridge over a tributary to the Arkansas River in north-central Oklahoma. This included relocating a driveway at one end of the bridge.


Stormwater Drainage – Fox Ridge

August 17, 2017

We were asked to create an upscale development with dominant water features and view-out basements resulting in desirable lots that would sell in a down economy. All of this needed to be accomplished within a budget that would make economic sense for the developer.


Kansas Star Casino Storm Water Control

June 20, 2017

The Kansas Star Casino development covers 206 acres including a 162,500-square-foot casino with hotel, parking lots and equestrian facilities. Site drainage design was a challenge as a result of multiple adjacent watersheds, downstream flow restrictions and shallow groundwater that had a history of causing problems within an adjacent residential development.


Eastborough Park / Kellogg Drive Buffer

April 18, 2017

In the early 2000s, the need to make Kellogg Avenue a major freeway through the center of the Wichita metropolis required demolition of the row of homes abutting Kellogg on southern border of Eastborough. We were engaged by Eastborough to represent it through the Kellogg construction process, and to devise a plan to buffer the effects of a major throughway right up against the small enclave’s southern border.


Recent Posts

The Orpheum has never looked better at 104 years old! We are so proud to have partnered with such a dedicated team to fully restore the Wichita Orpheum Theatre. Here’s to the next century of memories for our community! Great work by everyone involved.Congratulations to the Wichita Orpheum Theatre for 104 years of sharing stories, art and community.There’s something special about being part of a place that has meant so much to so many people for generations.We’re incredibly grateful to have played a small part in the story of this Wichita landmark and are excited to see the memories that will continue to be made here for years to come.Cheers to 104 years of history, and to the stories still waiting to be told.MKEC Engineering, Inc., Eby Construction Company, Schuler Shook ...
View on Facebook (opens in a new tab)
We were thrilled to provide our multidisciplinary engineering services for this terrific project with our friends at Hutton. 🤝 ...
View on Facebook (opens in a new tab)
An afternoon of pickleball was a fun way to wrap up the summer internships for some of our hard-working interns. We're so thankful for their contributions to our team this summer and will miss them as they head back to school. ...
View on Facebook (opens in a new tab)

Media Contact

Cindy Womack
316.684.9600

Email Us

Signup for eNews